Bethlehem Community & Care Center

The plan

Planning phase. An independent plan; nothing is funded or built yet.

The center would be the main home of the Community Care Network (a planned Project OS module, not built yet), which works through organizations that already exist and many small locations. The center never replaces them or speaks for them.

Outdoors

Indoors

Optional, if feasible

Safety

Steps

  1. Listen to the organizations and neighbors who already do this work.
  2. Find an existing building with outdoor space near a bus stop, and reach written agreements with the owners.
  3. Agree in writing with an operating nonprofit and partner organizations.
  4. Commission a licensed design study: building and fire codes, ADA, costs.
  5. Name a funding source for every cost.
  6. Permits and fit-out, with licensed professionals doing regulated work.
  7. Open small (food and water, restrooms, referrals), then add the rest.
  8. Measure honestly and share it as a template other communities can copy.

Detailed specifications for building it right, and the materials list, come once there is a real building. Nothing is designed for construction yet. When a building is chosen, a licensed architect and engineers write the drawings, specifications and materials list, with the owner's permission and the required reviews and permits. Materials follow the plan's rules: reused, local and low-carbon first.

All documents and downloads

Where it stands

Planning phase. There is no building, operator, partner or funding yet, and no hours or services to visit. We will only name an organization as a partner after it agrees in writing.